|
Illinois | For Swath / Section Control to work properly the physical measurements are very critical, make sure those are very close before you start adjusting any timings. But as far as the timings go:
Skipping entering headland - Decrease Turn off
Overlapping entering headland - Increase Turn off
Skipping exiting headland - Increase Turn on
Overlapping exiting headland - Decrease Turn on
Generally, the default timings are 1.0 for turn on and 0.6 for turn off. | |
|