|
C IL | Not sure I fully understand your scenario. On second read, it seems your planned bin will not have an aeration floor and the grain will sit on the concrete?
If the tube wears out, how will you replace if it slopes out of the concrete? You can't band it or replace it, and there wouldn't be a continuous concrete tunnel formed in the floor to simply slide a new screw in.
The sweep augers in our bins with aeration floors have a straight shaft out of the center gearbox to power the sweep, so for the sweep to run level on the floor the gearbox and tube have to be flat horizontally. | |
|