Posted 7/23/2014 12:45 (#3982216 - in reply to #3982204) Subject: RE: Pole placement for pole building.
SC Wisconsin
Nope I almost have the site ready for building. I originally wanted to put the foundation in first, but the old man talked me into ordering it so the posts were buried. I think it will be much easier having the concrete guys square up the building so I can just set the posts on top of the concrete and build it rather than trying to square it up and dig post holes myself.