|
 Casey IL. [ on I - 70 ] | A while back I talked about going to get some fiberglass peaces to make feeding troughs, will I got one done today thought might like to see it.
I have enough to make one more 10' and two 20'. This was my first ( 10' ) took me about 7 hrs. from start to finish. They are very heavy and durable. The cost 60.00 and the 7 hr. labor. Labor is free isn't it, has been all my life. One thing about it will never rust out.
32" wide at top - 24' across the bottom and 18' deep
Edited by tc806 12/3/2012 19:35
(Fiber feeder1.jpg.jpg)
(fiber feeder-1.jpg.jpg)
(fiber feeder2.jpg.jpg)
(fiber feeder3.jpg.jpg)
(fiber feeder4.jpg.jpg)
(fiber feeder5.jpg.jpg)
(fiber feeder6.jpg.jpg)
Attachments ----------------
Fiber feeder1.jpg.jpg (54KB - 29 downloads)
fiber feeder-1.jpg.jpg (50KB - 27 downloads)
fiber feeder2.jpg.jpg (58KB - 26 downloads)
fiber feeder3.jpg.jpg (52KB - 27 downloads)
fiber feeder4.jpg.jpg (83KB - 28 downloads)
fiber feeder5.jpg.jpg (71KB - 28 downloads)
fiber feeder6.jpg.jpg (85KB - 27 downloads)
| |
|