Whiskey, Tango, Foxtrot
With enough bracing it should work fine. By putting an X brace in between the poles (even cable works well, under tension) you can take the front to back (parallel to the ridgeline) sway out. Hard part is the side to side sway if you have a clear span building. It is going to be pretty hard to brace that properly without taking out much of the usable space inside the building. Almost going to need a brace running from ground level on one side to the top on the other.