AgTalk Home
AgTalk Home
Search Forums | Classifieds (78) | Skins | Language
You are logged in as a guest. ( logon | register )

Working Facilities
View previous thread :: View next thread
   Forums List -> Stock TalkMessage format
 
NDcattleman
Posted 11/13/2012 03:20 (#2694350 - in reply to #2683624)
Subject: RE: Working Facilities


North Central ND
This is the system I am currently building. Some of this drwing includes future expansion so its not exactly like this at the moment but I have most of it put up and need the finishing touches.

I built the whole works out of 2 1/3 in pipe and sucker rod using 2 7/8 in pipe for posts and 6 in posts for the gates.

In the drawing the orange things are gates set open so you can see how they swing.



(picture of corrals.jpg)



Attachments
----------------
Attachments picture of corrals.jpg (99KB - 85 downloads)
Top of the page Bottom of the page


Jump to forum :
Search this forum
Printer friendly version
E-mail a link to this thread

(Delete cookies)