I have a 54 ft toolbar (cultivator) with the dickeyjohn thermal transfer units on it. This would be the system with the 2 "cans" . At this temp (about 40-45 degrees) I can't get enough gas down. I am shooting for 110 lbs. actual. I was wondering if any of you use the equalizer system and if you have better results. I am plumbed for 1" all the way from the nurse tank to the TTU's. That is probably half my problem. I should be at 1 1/4. But its what im stuck with. TIA |