Posted 11/12/2009 20:49 (#922242) Subject: another cmc thought
Been thinking I have room for 15,000 of rice coming out of the field 15% TO 16% moisture to go on top of the 15,000 bu of 12.5 to 13% MOISTURE now I will have to run air on the rice coming out of the field to get it down what kind of quality will I lose on the rice thats already dry. Im trying to figure out if any quality would be lost milling weight etc. so i can explain to cmc .