Posted 3/18/2017 13:42 (#5907399 - in reply to #5907292) Subject: RE: Got started tiling
Sioux Falls, SD
We will be just a tic over 11' at the deepest. Should be at 3.5 to 4 ft in the cut with our plow to get 5' depth. 12" and 8" on the mains. Quad with a Wayne's plow. We will see how it goes.