|
Holland, Indiana (SW IN) | Only guessing but the next step is to put a trencher in the cut? --Install 10" or12" tile?
Have did some of our fields like that --end up with tile 10-15 ft deep in places-- was so wet down in the cut --needed a dozer to pull the trencher.
When you get done --can say like I said--"Made water run up hill" LOL
Love anything and most everything about tile--The end results the best--Dan
Edited by Dan Loehr 3/18/2017 14:09
| |
|