West Central IL | The diggers made good progress in the nice weather....finishing Matt's building and started on Josh's. Also, the concrete crew started to form the pit floor in Matt's building. Dick, Tony's Plumbing and Heating, installed electrical boxes and shut-off switches.
td: These are wean-to-finish buildings.
Edited by REDLEG 5/23/2013 08:18
(Electrical boxes and generator shut-off.jpg)
(North drive entrance and circle drive building.jpg)
(Matt's building from north driveway.jpg)
(concrete materials for Matt and Josh's buildings.jpg)
(Matt's dig completed and concrete forms started for floor.jpg)
(Josh's building started 20130522.jpg)
Attachments ----------------
Electrical boxes and generator shut-off.jpg (58KB - 134 downloads)
North drive entrance and circle drive building.jpg (74KB - 140 downloads)
Matt's building from north driveway.jpg (63KB - 144 downloads)
concrete materials for Matt and Josh's buildings.jpg (72KB - 139 downloads)
Matt's dig completed and concrete forms started for floor.jpg (85KB - 151 downloads)
Josh's building started 20130522.jpg (86KB - 140 downloads)
|