Ohio | Here is the scenario. I have fields that have a significant portion of the crop replanted (10-60 percent). In Apex, I have the original planting saved as a planting task and the replant saved as replant. Can I edit the Replant task to make it a Planting Task and merge the two to make only one variety map. Will the later planting override the earlier planting and work with the variety locator in the combine? Some of the time there would be a split planter and a section or parts of the field replanted. 3 or more varieties so it is not very practical to change manually. Thanks
Edited by growcorn 9/15/2011 21:51
| |
|