|
| I am not sure I understand what you are looking at from BBI.
If the unit is "ISOBUS Ready", I would that would mean that it already has the modules (or nodes), the pwm valve, sensors and all wiring so that all you have to do is plug into an ISO controller, and BAM, through the wonders of ISOBUS, it works the first time.
If the unit has a controller and lightbar????, this sounds more like a different can of worms.
As one form of an answer to your question, if the unit was set up with Raven's new ISO node system, in theory you should be able to plug that into a JD2600 and if you had a VRA unlock, you could do product control according to prescription. There are probably other systems out there, but I am familiar with Raven's unit.
| |
|