Looking at possibly getting an 80 tiled out this fall. Did a little research on here and found some older posts on tile install quotes are these in line for my area? I realize price of tile is down a little, are install costs still abut the same? I would assume bidding is (Cost of tile + Cost of install + $x.xx/hour for the backhoe doing connections?) Just trying to get an Idea of what I'll be getting myself into when talking to contractors. Found this thread: http://talk.newagtalk.com/forums/thread-view.asp?tid=341699&pos...
(Screenshot (89).png)
Attachments ---------------- Screenshot (89).png (84KB - 80 downloads)
|