|
Alliance, NE | Hopefully I will be finished with this project on monday. It's turning out nice, I think, so far. I will post more pics when I get them. Left side has a 10' x 2' extention and right side is 81" x 2' extention. After bracing is finished I will add my cage walls back on and each side will also fold down for easy chemical loading. In the winter time everything will fold for narrow transport.
Edited by stricker78 3/12/2016 11:20
(20160311_164828.jpg)
(20160311_164816.jpg)
(20160311_114254.jpg)
(20160311_113841.jpg)
(20160311_113826.jpg)
Attachments ---------------- 20160311_164828.jpg (136KB - 63 downloads) 20160311_164816.jpg (83KB - 57 downloads) 20160311_114254.jpg (124KB - 58 downloads) 20160311_113841.jpg (84KB - 56 downloads) 20160311_113826.jpg (147KB - 58 downloads)
| |
|