|
Wisconsin | On both of our Greenstar systems we have a harness that runs from the globe to the inside of the cab to give a speed signal to a raven liquid flow controller. One is on a 8230 and the other is on a 8245R. We were pressed for time in the spring and just ran the harness on top of the roof and down through the back window to get through planting. The dealer is telling me that is how Deere says to route it, but I am having a hard time believing it. It looks like hell hanging off the back of the cab. Right in the instructions it says the installation time is 3 hours but it doesn't give any more information. What is the correct way to route this harness? Thanks
Edited by 3500ctd 10/5/2014 08:57
| |
|